Los Angeles / Long Beach: a container staging hub to reduce onshore congestion

The Harbor Performance Enhancement Centre will occupy a site of more than 4 hectares close to the 14 terminals in San Pedro Bay. The US$130 million facility will be capable of processing 3500 truckloads per day. The aim is to boost productivity by 10% and reduce emissions by cutting waiting times and simplifying container drop-off and collection.

Full article: Port Technology / Marine Link / Railway Age

Leave a Reply

Your email address will not be published. Required fields are marked *